The timeline shows projects, epics and their work items as bars on one time axis. You see what runs when, what waits for what, and how the plan has moved since it was first made.

Where to find it

  • Projects › Timeline shows every active project you can open, each with its epics and items.
  • In a project, open the Timeline tab and choose Roadmap. Schedule next to it is the detailed schedule with the critical path.

Reading the timeline

Portfolio timeline with zoom buttons, a legend, sprint bands and milestone diamonds along the top, a red today line and bars for a project, an epic and its items
Projects › Timeline: projects, epics and items on one time axis, with sprints, milestones and today’s date.
  • Each row is a project, an epic or an item. Use the arrow beside a row to show or hide what sits under it.
  • A bar runs from the item’s start date to its due date. An item with only one of the two dates gets a one-day bar.
  • An item without dates in a sprint takes the sprint’s dates. Its bar is hatched, so you can tell it is an estimate.
  • An item with no dates at all shows a No dates label.
  • The filled part of a bar is how much is done: the share of finished child items for an epic, otherwise the checklist, otherwise the item’s status.
  • An arrow joins an item to the item it blocks.
  • Sprints appear as bands along the top. Milestones are diamonds; a missed milestone is shown in red.
  • The red line is today.
  • A dashed line under a bar is the item’s first plan: the dates it had when it was first given dates. It appears when the dates have changed since.

Zoom and moving through time

Choose Weeks, Months or Quarters. Earlier and Later move the window; Today brings it back. The page address keeps your choice, so you can share it.

Changing dates

Move an item

Drag a bar to move it. Drag either end to change only the start or the due date.

Or use the keyboard

Select a bar, then use the left and right arrows to move it by a day. Hold Shift to move only its end. Up and down go to the next row. Enter opens the item.

Check the result

The new dates are saved at once. If the change is not allowed, the bar goes back to where it was and a short message says why.

You can change dates only on items you are allowed to edit. Items in archived or locked projects, and items someone else changed a moment ago, are not moved. People using a support session can view the timeline but cannot change it.

Schedule and critical path

The Schedule view of a project shows the calculated schedule as a table: item, start, finish, duration, float, whether the item is on the critical path, and its number of conflicts. On a wide screen bars are drawn beside it. You can zoom by Days or Weeks and choose Critical path only. The schedule counts working days, Monday to Friday, and is recalculated automatically every few minutes.

A project’s Schedule view with the last calculation time, Days and Weeks zoom, a Critical path only button and a table of items with start, finish, duration, float, critical path and conflicts beside hatched and solid bars
Schedule: duration and float in working days, the critical path and conflicts for each item.

Float is how many working days an item can slip before it delays the project finish. Items with no float form the critical path: if one of them slips, the project finish moves with it. That is why the critical path is the first place to look when a deadline is at risk.

Dependencies link two items. Each has a lead or lag in working days, and can link items in different projects:

DependencyMeaning
Finish-to-startThe second item starts after the first finishes
Start-to-startThe second item starts after the first starts
Finish-to-finishThe second item finishes after the first finishes
Start-to-finishThe second item finishes after the first starts

A dependency that would create a loop is refused. The conflicts list names items that start before their predecessor, finish after their milestone or release, fall outside their sprint, or break their date constraint.

People who can edit the schedule change an item’s scheduling mode, duration, date constraint, predecessors and successors from the timeline. Every change is previewed first:

Changing the schedule

For the full schedule rules, see Planning and delivery.

Limits

One view shows up to two years and up to 2,000 items. If there are more, open a single project or choose a shorter range.